Product Installation
◈ Exterior Wall Installation
1Fiber cement board preparation: Install supporting aluminum accessories on the back of the board.
2Construction wall preparation: Clean surface and mark position lines.
3Wire hanging: Use steel wire for vertical alignment control.
4Keel installation: Fix angle irons and square steel tubes; check perpendicularity.
5Board installation: Mount processed boards on the keel using aluminum accessories.
6Joint treatment: Use fiber cement powder mixing glue to fill seams and paint.
◈ Partition Board Installation
1Fix top and bottom keels with expansion bolts.
2Align vertical keels (generally 612mm spacing).
3Cut board material to required dimensions.
4Fix boards to keel using tapping screws (200-250mm interval).
5Maintain expansion seams of about 4mm between boards.
◈ Floor Board Installation
1Ensure steel structure welding is polished flat.
2Lay boards longitudinal to the main beam.
3Leave 3-5mm gaps between boards.
4Use M5*45mm countersunk head tapping screws for fixing.
Main Products
Plywood, MDF board, Particle board, Chip board, Gypsum board, Fiber cement siding board, Non-asbestos cement board, Calcium Silicate Board etc.
Frequently Asked Questions
What are your terms of packing?
Generally, we pack our goods in bundles or wood pallets. We can also provide customized packaging according to customer requests.
What are your terms of payment?
We accept 30% T/T in advance, and 70% during the period of shipment, or L/C at sight.
What are your terms of delivery?
Our standard delivery terms include EXW, FOB, CFR, and CIF.
How about your delivery time?
For stock items, we can ship within 15 days after receiving the deposit. For new production, it usually takes about 20-25 days.
Can you produce according to samples?
Yes, we can produce based on your samples or technical drawings. We also have the capability to build molds and fixtures.
Do you provide samples for free?
We provide samples free of charge; however, the customer is responsible for the shipping costs.